
Coast Guard Station Flooring
Wrightsville Beach, NC
The Wrightsville Coast Guard Station Flooring Replacement project involved the installation of approximately 1,200 square feet of new luxury vinyl plank (LVP) flooring throughout four interior spaces within the facility. The scope included the installation of a high-performance floating flooring system with an integrated vapor barrier membrane to enhance durability, moisture protection, and long-term performance in an active operational environment.
Construction was carefully phased to complete two rooms at a time, allowing facility personnel to relocate furnishings as needed and maintain ongoing operations throughout the project. The completed flooring upgrade provided a modern, resilient finish that improved the functionality, appearance, and longevity of the interior spaces while minimizing disruption to station activities.
Client:
Location:
Architect:
Size:
Contract Type:
Project Details
NC Coast Guard Station
Wrightsville Beach, NC
Apogee Consulting Group, LLC
1200 sqft
Design-Build
